Missing links – Lewisham West upgrade

What are we doing in this area?

The upgrades in the Lewisham West area between Longport Street and Old Canterbury Road include:

  • A new path, parklands and natural areas in the light rail corridor near Lewisham West
  • New in-corridor shared path next to the light rail
  • Natural parkland creation and design
  • Installation of new path lights
  • Installation of public art
  • Installation of rest stop
  • Landscaping and ecological restoration
  • New dog off-leash area and wetland
  • New traffic signals at Old Canterbury Road with pedestrian/cyclist crossing
  • Weston Street closed for motorised traffic from Old Canterbury Road, accessible for pedestrians and cyclists only
  • Wayfinding signage

When are we doing this?

Construction in the Lewisham West area has started in September 2023 and is anticipated to be completed in 2025.

Images

Artist impression - Lewisham West, looking north towards Longport Street tunnel:

Lewisham West view towards Longport St tunnel

Artist impression - corner Edward Street and Old Canterbury Road:

Edward Street

The method for the new tunnel construction under Longport Street is a 'canopy tube' method, whereby 19 tubes are drilled in horizontally to form an arch shaped 'canopy'. Now that the arch-canopy is formed, the tunnel is carefully excavated in small increments, each time stabilised by a steel arch. The half-way point was reached on 10 February 2025. The tunnel breakthrough will take place later this year. 

The canopy arch is formed, and excavation is progressing:

GreenWay Longport St tunnel halfway point - 10 Feb 2025

Longport St tunnel excavation progress 24 Feb 2025

GreenWay Longport St tunnel halfway point from inside tunnel - 10 Feb 2025

The steel shapes to support the canopy arch:

LW Longport St tunnel steel canopy pieces 10 Dec 2024

The steel tubes used to form the canopy arch:

Longport St tunnel E - 3 July 2024

The new dog park, east of the Lewisham West light rail, is complete and the opening event took place on 7 December 2024:

group photo dog park opening event

The new wetland bioretention area, east of the Lewisham West light rail is completed. This area is for stormwater management and habitat creation only, and not accessible to the public:

LW wetlands 7 Dec 2024 

Temporary watermain diversion works to allow for tunnelling works for the new tunnel under Longport Street:

Watermain diversion Longport Street 31 May 2024

Before the GreenWay shared path is in place, a temporary access road is being created to allow for the construction of the tunnel under Longport Street:

Lewisham West access road 1

Lewisham West temp access road 2

New fencing separating the light rail from the future GreenWay path has been installed:

Lewisham West fence north

explore content banner

GreenWay construction updates

Works in progress

Upcoming works

Completed works

 

Rate this page

  • Rate as The content was useful100.00% The content was useful votes
  • Rate as The content was not useful0% The content was not useful votes

Thanks for your feedback. We will use this data to improve the content of this page.

Page last updated: 27 Feb 2025